Аннотация:The article proposes effective methods for temporal analysis and calculation of generalized network models. Based on them, a class of parametric network models is constructed and applications of such models to the problems of distributing limited resources of complex production systems in the aviation industry under conditions of work intensification are considered. A number of scheduling dates have been specified. Consistency conditions and resource solvability criteria for some classes of problems on such models are studied.